Suvanna Migada Mahar Stupa Project is one of its kind and a considerably large project in Muse. The project started in 2013. Since then, geographical survey, design drawing, earthwork volume calculation, constructing a new project access road, and ground breaking ceremony had been conducted.
Due to changes in design drawing, after concrete placement of the foundation of the Stupa, the project has been suspended since 2015. The construction of the Stupa, however, was able to restart again in the last quarter of 2018.
For the construction of the project will be depended on the amount of donation received, the construction contract will be divided into phases. The following is the salient points of the Stupa, up to Pallanga stage: